Hone

Lessons · Project management · the critical path

The critical path: the chain with no room

The critical path is the longest path through the network and the chain of activities with zero float; its length is the project's duration, and any slip on it moves the end date.

Hone is a place to practise a career, one idea a day. This is one of its lessons, written out in full and free to read without an account.

Not yet checked by an experienced project manager. This lesson was written for Hone. Practice material, not professional advice. What that means.

What it is for

With thirty activities, you cannot watch them all. The critical path tells you which eight to watch every morning. The other twenty-two can slip a little; these eight cannot slip at all.

How to think about it

Do both passes, compute float, and mark every zero-float activity. They form a continuous chain from start to end; that is the critical path. Check it by adding the durations along it: the sum must equal the project duration.

Worked example

Floats: A 0, B 0, C 2, D 0
From the forward and backward passes.
Critical path: A → B → D
The zero-float chain. It is continuous, from the first box to the last.
3 + 4 + 5 = 12 days
The check: the sum along the critical path is the project duration.
C is not critical, with 2 days of float
Watch it, but watch A, B and D first.

Your turn

Write the test for whether an activity is on the critical path.

Its total float is .

The trap

Believing the critical path is fixed. When C slips three days, A-C-D becomes 13 and C is now critical while B has a day of float. Recompute after every change.

Next in Project management

Every Project management lesson on one page

Practise the critical path on HoneA question on it now, a real problem where there is one, and it is remembered for review. Free, no email needed.